Assembly Of Air Pump
Dec 24, 2018

Pump body: Check the rotation of the unloading ring - the steel sheet is chamfered - the upper end cover is attached - the top clearance is adjusted - the rotor is assembled - the lubrication is adjusted, and the axial clearance is adjusted.

Installation of the cooling pipe base and the base: If the oil return pipe is clogged, it must be unblocked. The asbestos pad under the cooling tube seat can not be reversed, otherwise the oil and gas can not be completely separated, so that the air pump can be injected.

Left and right fan wheels: can not be installed reverse, otherwise it will not be cooled.